Doug Wetton Properties Request for Proposal
Doug Wetton Properties is requesting proposals based on the following information. All proposals should include the following services.
​
-
Owner requesting Contractor perform the following services:
-
Pull permit
-
Structural - foundations, roof, and structure
-
Provide full underground electrical and plumbing connections or septic
-
Framing & insulation
-
Drywall
-
HVAC per the call out on the plans
-
Roofing repair or replacement if necessary
-
Rough electrical & plumbing
-
Connection to hot water via existing community boiler, or individual water heaters (also per the plans)
-
Finish carpentry including kitchen cabinets, vanities, closets, baseboards, moldings, interior doors & jambs, and shelving
-
Finish electrical including all electrical panels/sub-panels, lighting (can lights 4 in the living room, 2 in kitchen, 4 in the bedroom), wall switches, wall plugs, smoke alarms, bathroom sconce, exterior light sconce, and carbon Monoxide devices.
-
Finish plumbing including all drains, fixtures, sinks, valves, bathtubs, garbage disposals, and connections
-
Appliances - Installation of all appliances (provided by Owner) including refrigerator, oven/stove, dishwasher, microwave, and wash & dryer when indicated
-
Interior & exterior paint - two-color interior and touch-up or full paint on exterior as needed to match the existing color
-
Exterior Windows & doors - provide and hang all windows and doors (Contractor to spec window and doors and approved by owner)
-
Exterior stucco patch or replacement & wood trim
-
Flooring - to be provided by Owner and installed by 3rd party contractor
-
Countertops - Quartz countertops in kitchen and bath (also can be provided by owner but installed by 3rd party
-
Backsplash - White subway tile - prefab quartz backsplash in and around the bathroom vanities
-
Showers - Fiberglass tubs & surrounds
-
Misc fixtures - all towel bars, toilet paper holders, bathroom mirrors, exterior address numbers, interior faux wood blinds
​
Attached a typical order list for the parts we use for our turns.
-
For other material, we use the following - RTA Shaker Cabinets with MDF fronts (Typically through a company like NGY, Or Elegant Stone)
-
Snow White prefab Quartz
-
Shaw Muse Plank - which we use our Vendor most likely to keep the portfolio consistent.
-
Dunn Edwards Bone color on walls, and Swiss coffee trim
-
Appliances, - typically entry-level stainless steel. Amana or Frigidaire
​
ADDITIONAL NOTES
Contractor to provide all permit sign-offs from City and receipt of CofO.
​
The owner will cooperate with the Contractor on progress & final payments. The owner will require releases on all draws and the Contractor will work with Bank on all draw requirements.
​
All proposals should be emailed to Doug@DWInvestments.com
For any questions, please call Joe Shipley at 949-310-5639